WaterTech Logo
HOME | ABOUT US | CONTACT US | WEBMAIL
Drainage And Environmental Projects PROJECTS
Water and Wastewater | Drainage and Environment
 
Roads And Drains Rehabilitation In Accra
Studies, design and tender documents and supervision of construction. Some 260km of roads had been programmed for rehabilitation in Accra. The work involved studies and tests to determine the rehabilitation requirements of these roads and the design for the rehabilitation of roads and drains in the Central Business District as well as a number of priority roads. The work also included the revision of the 1963 Drainage Master Plan of the city to ensure that the water collected in roadside drains could be safely discharged through their ultimate outlets into the sea. This work which was started in September 1990, was done in association with Mott MacDonald International of the U.K. who were the lead consultant. Watertech’s contribution was mainly in the drainage section. The road component was constructed from 1996 to 2000 with Watertech providing most of the supervision personnel.
CLIENT : Department of Urban Roads
COST : US$ 200million
 
Storm Water Drainage Master Plan for Kumasi
Master planning, feasibility studies, detailed design, and preparation of tender documents. Study of the storm water drainage problems in Kumasi and production of a Master Plan for the orderly development of primary, secondary and tertiary drains and the design and supervision of works for prevention of the many flood and erosion problems in the city.
CLIENT : Department of Urban Roads
COST : US$ 10million
 
Accra Townships Drainage Project
Planning, design and tender documentation for storm drainage schemes for 19 suburban townships in Accra. Study of the storm water drainage problems and design of drainage networks for Abelenkpe, East Legon, Adogon, East Adenta, West Adenta, Haatso, Madina, Dome, Taifa, New Achimota, Kisseiman, Agbogba, New Ashongman, Akweteman, Nii Boyeman, Awoshie, Gbawe and Sowutuom in Accra. 1998
CLIENT : Department of Urban Roads
COST : US$ 32.8million
 
Kumasi Drainage Improvement Works
Supervision of construction of the Phase I works. Construction of improvements to the middle and lower sections of Nsuben Drain and construction of a parallel drain to the Subin Valley drain. 2001
CLIENT : Ministry of Local Government and Rural Development under the World Bank Urban Environmental Sanitation Project.
COST : US$ 10million
 
 
 
 
 
1 2
 

 

  • Tiger
    Accra Drains Improvement Project.
  • Projects
    Water Supply Sector Rehabilitation Project
  • Butterfly
    Nsawam Water Supply Rehabilitation and Expansion Project.
  • Butterfly
    Onyasia and Mataheko Drains Construction.
WATERTECH We are always happy to hear from you, let us know how best we can serve you today
General Enquiry | Contact Us
Copyrights 2016 . Watertech Company Limited. All Rights Reserved
For More Information on our services you can email us on info@watertechgh.com or call us on +233 202 632325
Site Designed and Maintained by BlooSpidaz 2016
Designed and maintained by BLOOSPIDAZ