Review of 9 storm drains in Accra, preparation of preliminary designs for Lafa drain and preparation of detailed designs and tender documents and supervision of construction of Mataheko and Onyasia/Dzorwulu drains, including preparation of EIA and RAP. 2008
CLIENT : Accra Metropolitan Assembly
COST : US$ 5Million
Accra Storm Drain Maintenance Programme
Preparation of Drain Inventory, Emergency Clean-up Plan, Drain Maintenance Organisation and Drain Maintenance Programme for the drains in the Accra Metropolitan Area, Bid Documents for maintenance and recommendation for organizational structure. Drain Inventory for all drain basins under the Accra Metropolitan Assembly and the impact on flooding in the catchments within low lying areas. Recommendations for technical, institutional and financial requirements to improve operation and maintenance of the existing drainage systems. 2010
CLIENT : Accra Metropolitan Assembly
COST : US$ 5million
Community Infrastructure Upgrading And Storm Drainage In Accra Project
Review of existing detailed design, preparing of EIA and RAP, preparation of, detailed design and tender documents for Mamponse community upgrading and the Chemu storm drain. Supervision of construction of the project. Lead consultant on the project was DHV International with Watertech Ltd. as an associate for the project. 2011
CLIENT : Accra Metropolitan Assembly
COST : US$ 8.3million
Off-Site Drainage Study And Design Of Improvements To Complete The N1 EIA and Mitigate Potential Flooding Impacts Due To The N1 Road Improvement
Review of existing preliminary design, preparation of detailed design, tender documents for Off-Site Drainage Study and Design of Improvements to Complete the N1 EIA and Mitigate Potential Flooding Impacts due to the N1 Road Improvement. This project was part of the Upgrading of N1 Highway between Tetteh Quarshie Interchange and the Mallam Road Junction, Accra. Lead Consultant on the project, was ICT – BANS Consult with Watertech Ltd. as Sub Consultant.2009
CLIENT : Millennium Development Authority
COST : US$ 2million
Lafa and Onyasia Drainage Project
Preliminary Engineering Design of Lafa and Onyasia Drainage Channels 2015
Overview of and insight into the adequacy of the available data on the Onyasia drain and Lafa drain
Demonstration of the technical feasibility of the project with finalized technical designs of the Onyasia drain and Lafa drain
Assessment of the environmental and social impacts of the project
Demonstration of the financial feasibility of the project
Demonstration of the long - term sustainability of the project
Nsawam Water Supply Rehabilitation and Expansion Project.
Onyasia and Mataheko Drains Construction.
We are always happy to hear from you, let us know how best we can serve you today General Enquiry | Contact Us
Copyrights 2016 . Watertech Company Limited. All Rights Reserved
For More Information on our services you can email us on info@watertechgh.com or call us on +233 202 632325
Site Designed and Maintained by BlooSpidaz 2016