Studies, Engineering Designs for Civil works and Dredging works, Report on formulation of National Dam Safety Unit, Preparation Tender documents.
The project is looking at rehabilitating nominated water supply dams and weirs of GWCL in Ghana to meet the water supply demand for year 2020. This is to be done through possibly dredging or heightening of the dam crests to retain more water. The appropriate method is to be determined after the detailed engineering study has been completed.
The above is a joint venture project being headed by Norconsult from Norway with Mott MacDonald UK and Watertech Ltd as associate consultants to the project. 2007
CLIENT : Ghana Water and Sewerage Corporation
COST : US$8.2million
Kumasi Water Supply Rehabilitation and Expansion Project
Description:
Detailed Design and Supervision of Construction of Water Supply System Rehabilitation and Expansion. 2009
The project was the rehabilitation and expansion of the Owabi and Barekese Water Treatment Plants and
The Rehabilitation and Extension of the Transmission and Distribution Network of the Kumasi Water Supply System.
CLIENT : Ghana Water and Sewerage Corporation
COST : Euro 35 million
Nsawam Water Expansion and Rehabilitation Project
Review of Design and Supervision of Construction of Nsawam System 2015
Design and engineering for phases 1 and 2
Construction of intake to cater for 2025 raw water demand
Construction of Low Lift pumping station to cater for 2025 abstraction demand
Expansion of treatment plant to meet 2025 water demand
Replacement of the main transmission pipeline between the water treatment plant and the existing reservoir
Rehabilitation of the distribution network in Nsawam
Rehabilitation of the existing Nsawam Reservoir
Expansion of water to 11 localities along the main road from Tantra Hill to Nsawam
Construction of high lift pumping station with variable frequency controls to meet 2025 water demand
Supply and installation of laboratory equipment
Technical Assistance; supply and installation of zonal meters with data loggers, operational and managerial assistance to GWCL.
CLIENT : Ghana Water and Sewerage Corporation
COST : Euro 9million
Second Accra Sewerage Improvement Study
Preparation of Inventory of Sewerage Systems in the North- Legon University, UPSA, Presec and Achimota School, Accra Central and West-Dansoman, Determination of Rehabilitation Needs and Detailed Designs and Preparation of Tender Documents for the Rehabilitation of the Systems. 2014
Nsawam Water Supply Rehabilitation and Expansion Project.
Onyasia and Mataheko Drains Construction.
We are always happy to hear from you, let us know how best we can serve you today General Enquiry | Contact Us
Copyrights 2016 . Watertech Company Limited. All Rights Reserved
For More Information on our services you can email us on info@watertechgh.com or call us on +233 202 632325
Site Designed and Maintained by BlooSpidaz 2016